000 | nam a22 7a 4500 | ||
---|---|---|---|
999 |
_c14338 _d14338 |
||
005 | 20220418150240.0 | ||
008 | 220323b ||||| |||| 00| 0 tha d | ||
040 |
_aRID _beng _cRID |
||
082 |
_aRID. 354.3 _bS7F 2021 V.2/9 |
||
110 | _aSamart Engineering Consultants. | ||
245 | _aFeasibility Study and Enviromental Impact Assessment Control Structures in the Ping River Downstream of Bhumibol Dam Tak, Kamphaeng Phet and Nakhon Sawan Provinces Final Report Feasibility Study and Enviromental Impact Assessment Ban Mae Ya Control Structure, ban Tak District Tak Province Volume 2/9 Executive Summary Report (FS). | ||
260 |
_aBangkok : _bRoyal Irrigation Department, _c2021. |
||
300 |
_a1 Book : _billustrations ; _c30 cm. |
||
650 |
_aWater _xEffect of environment on. |
||
650 |
_aน้ำ _xผลกระทบจากสิ่งแวดล้อม. |
||
650 | _aBan Mae Ya Control Structure. | ||
650 | _aอาคารบังคับน้ำบ้านแม่ยะ. | ||
710 | _aThammachart Consultant. | ||
710 | _aSigma Hydro Consultant. | ||
942 |
_2ddc _c12 |
||
998 | _cนงลักษ์. |